Prime cost price
According to NRM 2, RICS new rules of measurement, Detailed measurement for building works, published by the Royal Institution of Chartered Surveyors (RICS) in April 2012:
Where the exact type of product or component cannot be specified, an estimated price for the product or component shall be given in the description as a prime cost price (PC price). State, for example, ‘Allow the PC price of £x per thousand delivered to site’, ‘Allow the PC price of £y per m2 delivered to site’, or ‘Allow £z each delivered to site’. Unless specifically stated otherwise in the bill of quantities or in these rules, the contractor shall be deemed to have allowed for all items listed in paragraph [IP address hidden] in his or her priced rate for each building component/item incorporating a PC price. PC prices shall exclude any allowance for the main contractor’s overheads and profit, which are dealt with separately. |
Paragraph [IP address hidden] refers to:
- (1) labour and all costs in connection therewith;
- (2) materials and goods together with all costs in connection therewith;
- (3) assembling, installing, erecting, fixing or fitting materials or goods in position;
- (4) plant and all costs in connection therewith;
- (5) waste of goods or materials;
- (6) all rough and fair cutting unless specially stated otherwise;
- (7) establishment charges; and
- (8) cost of compliance with all legislation in connection with the work measured including health and safety, disposal of waste and the like.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.